Engineering and Contracting

A GRAINTEC project is tailor-made to the customer's requirements; it is never a "standard" solution. A financially and technically viable project can be prepared only if the customer's requirements are thoroughly defined and established.

In the project definition period all design criteria, pre-engineering works and descriptions are settled. An exchange of alternatives, scrutiny of technology and financial possibilities take place prior to the moment when the ideas are incorporated in the overall plan.

During this period GRAINTEC A/S acts as consultant to our customers and assists in the definition of the project. Focus will be on areas where the future project must satisfy the highest requirements.

For further information about Directives, Rules and Regulations:

ATEX137 (Hazard Area Classification, Directive 1999/92/EC)
IPPC (Integrated Pollution Prevention and Control)
BAT (Best Available Techniques)
BREF (BAT Reference)
HACCP (Hazard Analysis and Critical Control Points)
European Feed Manufactures Guide (EFMC)

 

http://www.fefac.org/code.aspx?EntryID=265